Settlement Analysis
of Pakpanang Closure Dam

Settlement Analysis of Pakpanang Closure Dam

Kasem Petchgate
King Mongkut 's University of Technology Thonburi

Chirdchanin modmoltin
Siam University

Panich Voottipruex
King Mongkut’s Institute of Technology North Bangkok

A.Pirat
King Mongkut 's University of Technology Thonburi

1. INTRODUCTION
  • Parkpanang Closure Dam and Emb. No.2 is a part of Parkpanang water gate.
  • The total length of the project is 222 m.
  • Sand Core,Crest EL.+3.40 m. ,MSL. Slope of Embankment 1:3 , 1:5
  • Stabilized by Soil-Cement Column dia.1.60 m. @ 3.00 m. Length 10.00 m. Quantity 72,000 Cu.m.